Film: Hotel Jakarta – 9 floors in X-LAM

Together with Ursem Modulaire Bouwsystemen the DERIX Group is constructing a hotel with 9 floors, right in the centre of Amsterdam.

A vital aspect of this project is the modular timber construction with preassembled components.For the entire construction 2,100 m3 of timber are used and visible surfaces are refined with 550 m3 of silver fir timber. All timber components have already been assembled at the factory, which guarantees a time-saving assembly on site. Currently, the 176 modules are being installed at the construction site. As 12 modules are installed per day, the hotel will be opened by the end of 2017.

Hotel Jakarta takes pride in being the first hotel in Amsterdam realized as an energy-neutral construction. The hotel has 200 luxurious rooms and suites, a sky bar, various restaurants, an espresso bar and an underground car park. Further to that, the hotel guests are welcome to relax at the wellness area with pool and fitness studio, or they can enjoy the tropical garden.


Watch our video about the production and assembly of Hotel Jakarta Hotel in Amsterdam: